Members of the Water Supply Mgmt Committee and the Water Engineer set out to determine the length of the new water line.
The water line's path is charted through farmyards, fields, and forest.
The distance for the new line is measured.
It's a hot day on the mountainside.
The terrain gets rougher as the group members close in on the water source.
The group takes a short break to discuss the pipe line's installation details.
Ground cover must be removed to clear an entrance to the cave.
The fresh water source is near the cave entrance.
The fresh water exits above ground at this point.
A sample is taken.
The final measurements are made.
Mission accomplished. The engineer leaves to prepare the official report.